CHILLER WATER SYSTEM HOOK UP (AIR HANDLING UNIT, FAN COIL UNIT, CHILLER & PUMP)


 CHILLED WATER SYSTEM - HOOKUP DETAILS 






1. Fan Coil Unit.

2. Air Handling Unit.

3. Chiller.

4. Pump


1.Fan Coil Unit.


Inlet Line :                                                 

1. GV - Gate Valve (or) Isolating Valve.                                            
2. BV - Balancing Valve.
3. STR - Strainer.
4. PG - Pressure Gauge.
5. TG - Temperature Gauge.
6. FC - Flexible connection.

Outlet Line :                                                 

1. GV or IV - Gate Valve (or) Isolating Valve.                                  
2. 3 Way Valve.
3. PG - Pressure Gauge.
4. TG - Temperature Gauge.
5. FC - Flexible connection.







Inlet Line :                                                 

1. GV - Gate Valve (or) Isolating Valve.                                            
2. BV - Balancing Valve.
3. STR - Strainer.
4. PG - Pressure Gauge.
5. TG - Temperature Gauge.
6. FC - Flexible connection.

Outlet Line :                                                 

1. GV or IV - Gate Valve (or) Isolating Valve.                                  
2. 2 Way Valve.
3. PG - Pressure Gauge.
4. TG - Temperature Gauge.
5. FC - Flexible connection.


2.Air Handling Unit


Inlet Line : 

1. GV (or) IV- Gate Valve or Isolating valve                                            
2. BV - Balancing Valve
3. STR - Strainer.
4. PG - Pressure Gauge.
5. TG - Temperature Gauge.
6. FC - Flexible connection.

Outlet Line :                                                 

1. GV or IV - Gate Valve (or) Isolating Valve                                      
2. 3 Way Valve
3. PG - Pressure Gauge.
4. TG - Temperature Gauge.
5. FC - Flexible connection.




Inlet Line : 

1. GV (or) IV- Gate Valve or Isolating valve                                            
2. BV - Balancing Valve
3. STR - Strainer.
4. PG - Pressure Gauge.
5. TG - Temperature Gauge.
6. FC - Flexible connection.

Outlet Line :                                                 

1. GV or IV - Gate Valve (or) Isolating Valve                                      
2. 3 Way Valve
3. PG - Pressure Gauge.
4. TG - Temperature Gauge.
5. FC - Flexible connection.


Chiller 




Inlet Line : 

1.AAV - Automatic Air Vent.
2. IV - Isolating Valve (or) Gate Valve.
3. STR - Strainer.
4. T.G - Temperature Gauge.
5. P.G -Pressure Gauge.
6. FC - Flexible Connection.



Outlet Line :

1. IV - Isolating Valve (or) Gate Valve.
2. MBFV - Motorized Butterfly Valve.
3. D.R.V - Double Regulating Valve.
4. F.S - Flow Switch.
5. T.G- Temperature Gauge.
6. P.G - Pressure Gauge.
7. F.C- Flexible Connection.



PUMP :





Suction Side:

1. IV - Isolating Valve (or) Gate Valve.
2. STR - Strainer.
3. DC - Drain Cock.
4.PG - Pressure Gauge.
5. FC - Flexible Connection.
6. RE - Reducer.

Discharge Side.

1.RE - Reducer.
2.FC - Flexible Connection.
3.PG - Pressure Gauge.
4.NRV - Non Return Valve (or ) Check Valve.
5.DRV - Double Regulating Valve.
6.IV - Isolating Valve (or) Gate Valve.





😊 Thanks😊 




For more hvac related topic info   👈 click this link   https://hvac4life2022.blogspot.com/

For contact Email  👈 click this link    https://www.blogger.com/hvacforlife2022@gmail.com

Join whatsapp group  👈 click this link    









Post a Comment

0 Comments